Current Projects

/Current Projects

Eramurra Solar Salt Project

, , , , , ,

Eramurra Solar Salt Project (2019 - Present) O2 Marine is currently engaged to undertake all required studies to support environmental approval for the costal and marine infrastructure required for the Eramurra Solar Salt Project, Cape Preston East WA. O2M is assisting the Client with preparation of Environmental approval for both EPA and EPBC. Several [...]

BCI Mineral Mardi Salt Project

, , , , , ,

BCI Mineral Mardi Salt Project (2018 - Present) O2 Marine is currently engaged to undertake all required studies to support the environmental approval for capital dredging and onshore disposal projects for the Mardie Salt Project, WA. The project is being undertaken to enable the construction of solar salt infrastructure and a marine export facility [...]

Eramurra Solar Salt Project: Coastal Processes Study

, ,

Eramurra Solar Salt Project: Coastal Processes Study To support the Solar Salt Project Concept-Select phase, O2 Metocean surveyed the region, established a digital elevation model (DEM), and undertook a coastal processes investigation. The investigation centred around an array of creeks, which feed into the target estuary, from which seawater could be extracted to feed [...]

Eramurra Solar Salt Project: Metocean Data Collection Programme

, ,

Eramurra Solar Salt Project: Metocean Data Collection Programme O2 Metocean is currently undertaking an oceanographic measuring programme on behalf of Leichhardt Industrials. Wave and current measurements will be used to inform the design and operational planning of the future salt export port at Cape Preston East, Western Australia. The oceanographic data collection programme was designed [...]

Onslow Marine Support Base – Dredge Monitoring

, , , , ,

Onslow Marine Support Base - Dredge Monitoring O2 Marine is currently engaged to undertake all dredge monitoring and management for a 1M m3 dredging project in Onslow, WA. O2 Marine are providing telemetered water quality monitoring at nine locations and Near-Real Time (NRT) satellite imagery analysis services to ensure compliance with EPA conditions during dredging. [...]

Midwest Ports Authority – Maintenance Dredge Spoil Sediment Assessment

, ,

Maintenance Dredge Spoil Sediment Assessment O2 Marine is currently engaged to provide a full sediment sample program for MWPA to survey and assess proposed maintenance dredge spoil in the Commercial Harbour and Navigation Channel. The scope of works includes development of a Sample and Analysis Plan, field survey SAP implementation and assessment and comparison [...]

Geraldton Port Annual Sediment Compliance Monitoring

, ,

Geraldton Port Annual Sediment Compliance Monitoring  O2 Marine is currently engaged to implement the annual sediment compliance monitoring survey on behalf of MWPA from 2018-2020. The 2018 project outcomes were achieved to the satisfaction of the MWPA Environmental Officer. The project field component was executed efficiently, in accordance with all relevant MWPA systems [...]