Metocean

/Metocean

Eramurra Solar Salt Project

, , , , , ,

Eramurra Solar Salt Project (2019 - Present) O2 Marine is currently engaged to undertake all required studies to support environmental approval for the costal and marine infrastructure required for the Eramurra Solar Salt Project, Cape Preston East WA. O2M is assisting the Client with preparation of Environmental approval for both EPA and EPBC. Several [...]

Sunset Beach Geraldton

,

Sunset Beach Geraldton (2019 - 2020) O2 Marine was engaged by the Greater City of Geraldton to implement a Six month metocean monitoring program to improve the understanding of the metocean conditions contributing to beach profile change at Sunset Beach, and support the verification and calibration of hydrodynamic numerical models, the design of coastal [...]

Eramurra Solar Salt Project: Coastal Processes Study

, ,

Eramurra Solar Salt Project: Coastal Processes Study To support the Solar Salt Project Concept-Select phase, O2 Metocean surveyed the region, established a digital elevation model (DEM), and undertook a coastal processes investigation. The investigation centred around an array of creeks, which feed into the target estuary, from which seawater could be extracted to feed [...]

Eramurra Solar Salt Project: Metocean Data Collection Programme

, ,

Eramurra Solar Salt Project: Metocean Data Collection Programme O2 Metocean is currently undertaking an oceanographic measuring programme on behalf of Leichhardt Industrials. Wave and current measurements will be used to inform the design and operational planning of the future salt export port at Cape Preston East, Western Australia. The oceanographic data collection programme was designed [...]