Port of Dampier Marine Environmental Quality Sampling and Analysis Plan (MEQSAP)
O2Marine was engaged to prepare a MEQMP for the Port of Dampier.
O2Marine was engaged to prepare a MEQMP for the Port of Dampier.
O2Marine was engaged to prepare a Marine Environmental Quality Management Plan (MEQMP) for the Port of Port Hedland.
DBCI engaged O2Marine to conduct a 12-month physical oceanographic study measuring wave, current, and water level data off the coast of Mardie Station in the Pilbara Region in the far north of West Australia.
O2Marine implemented a 12-month Metocean monitoring program at Southend and Beachport in Rivoli Bay, South Australia.
The Greater City of Geraldton engaged O2Marine to conduct a six-month Metocean monitoring program at two locations offshore of Sunset Beach, Geraldton.
O2 Metocean conducted coastal surveys and investigations to support the Solar Salt Project Concept-Select phase.