Water Quality Testing Services in the Port Geographe Artificial Waterways and Adjacent Marine Waters
O2 Marine was engaged to implement a water quality monitoring program to assess the health of the Port Geographe artificial waterways.
O2 Marine was engaged to implement a water quality monitoring program to assess the health of the Port Geographe artificial waterways.
Project Environmental Investigations and Approvals Client Onslow Marine Support Base Date 2017 – Present About the Project O2 Marine is currently engaged by Onslow Marine Support Base to undertake all required studies to support environmental approval for a 1M M3 capital dredging and onshore disposal project in Onslow, WA. The project is being undertaken to enable the expansion of the existing Onslow Marine Support Base in Beadon Creek. Specialist studies included, coastal processes, marine benthic habitat mapping, benthic habitat
O2 Marine provided telemetered water quality monitoring services within the FMG’s dredge material management area to ensure discharge water quality of the dredge return water meets the specified criteria.
O2 Marine is currently engaged to undertake all required studies to support environmental approval for capital dredging and onshore disposal project in Mardi, WA.
Through subcontractor Austral, O2 Marine was contracted to assist Rio Tinto in obtaining the environmental approvals required to execute the refurbishment of the Cape Lambert CLA Jetty.
O2 Marine has been assisting the DoT with the required marine environmental studies, investigations and drafting of documentation necessary to obtain the environmental approval for the project.