Project | Port Hedland Spoilbank Marina |
Date | 2019 – 2020 |
About the Project | O2 Marine has been assisting the DoT with the required marine environmental studies, investigations and drafting of documentation necessary to obtain the environmental approval for the project. In a record time of under 6 months, the Spoilbank Marina project was classified as NOT-Assessed by the EPA.
This project includes boat pens, a four-lane boat ramp, two breakwaters, internal revetment walls and an access channel to separate marina traffic from shipping activity. |