Port Hedland Spoilbank Marina

 

Project Port Hedland Spoilbank Marina
Date  2019 – 2020 
About the Project O2 Marine has been assisting the DoT with the required marine environmental studies, investigations and drafting of documentation necessary to obtain the environmental approval for the project. In a record time of under 6 months, the Spoilbank Marina project was classified as NOT-Assessed by the EPA. 

This project includes boat pens, a four-lane boat ramp, two breakwaters, internal revetment walls and an access channel to separate marina traffic from shipping activity.