Mardie Project – Marine Environmental Studies & Approvals
O2Marine was engaged to conduct all marine studies to inform environmental impact assessment and engineering design for a solar salt project on Mardie Station in the Pilbara WA.
O2Marine was engaged to conduct all marine studies to inform environmental impact assessment and engineering design for a solar salt project on Mardie Station in the Pilbara WA.
O2Marine worked with Wavelength Consulting to conduct an Environmental Impact Assessment and technical studies for a maintenance dredging project at Geraldton Port.
O2Marine conducted a Marine Environmental Pre-Feasibility Study and desktop review to assess potential impacts on conservation features and provide recommendations on design and necessary marine studies for the project.
O2Marine was engaged with Teal Solutions to undertake all marine studies to inform environmental impact assessment for the Port Hedland Spoilbank Marina
O2Marine conducted all marine studies, including benthic habitat surveys, sediment sampling, bathymetry surveys, water quality baseline, metocean baseline, mangrove health surveys, marine fauna investigations, underwater noise modelling, and management plans, to inform environmental impact assessment and engineering design for a solar salt project on Mardie Station in the Pilbara, WA.
O2 Metocean collected waves and current data offshore from Mardie, Western Australia for 16 months to inform and validate numerical dilution modelling of a potential waste bitterns discharge pipeline and inform the design criteria for a standalone export facility.